Zum Inhalt springen

5G & 6G Wireless Solutions

Test solutions for
wireless innovation

Build a practical measurement path from sub-6 GHz to millimeter-wave research. TXRX helps you review RF test equipment for base stations, connected devices, and satellite communication links, starting with the signals, interfaces, and evidence your project needs.

Pain points & challenges

Keep changing test demands
from slowing your project

Wireless development moves quickly. Equipment cost, procurement planning, changing frequency ranges, and uneven laboratory demand can complicate the route from an initial requirement to a repeatable test workflow.

Rising development costs

High-end RF equipment can absorb a substantial share of a project budget. Compare suitable configurations and equipment condition against the measurements you actually need, including accessories and verification.

Procurement uncertainty

Instrument selection and project scheduling need to move together. Confirm the required options, supporting documentation, current availability, and delivery arrangements before committing to a test plan.

Evolving measurement needs

Moving between frequency bands, signal formats, and channel configurations can change the equipment shortlist. Define the measurement boundary early and review upgrade paths before adding another instrument.

Uneven equipment utilization

A laboratory may need peak capacity for one development stage and much less afterward. Review shared workflows, existing assets, and the intended period of use when planning additional equipment.

Application scenarios

Turn requirements into
a workable test setup

Use these planning scenarios to frame a discussion about equipment, configuration, and the evidence required at each development stage.

Technical project consultation

01.

Plan wireless module verification

Start with the module's frequency bands, waveform, interfaces, and acceptance criteria. Review an analyzer configuration alongside signal generation, fixtures, software, and calibration needs, so the complete setup supports a defined measurement workflow.

Document the required options and test conditions before comparing equipment. This makes configuration differences easier to assess and helps keep procurement decisions tied to the engineering requirement.

Discussion of an equipment project

02.

Build test capacity around the project

Compare suitable used equipment with other procurement options in the context of your budget and intended use. Review condition, configuration, documentation, and any verification work together rather than considering the instrument alone.

Share the project schedule and deployment requirements with TXRX. Confirm availability and logistics for the selected equipment, then plan installation, acceptance checks, and handoff to the people running the tests.

Solution Enquiry

Discuss This Solution

Share your test requirements and we will review the right equipment and configuration for your project.

Anfrage

Discuss This Solution

Share your test requirements and we will review the right equipment and configuration for your project.

Geben Sie eine E-Mail-Adresse oder eine Telefonnummer ein.

Geben Sie Ihre geschäftliche E-Mail-Adresse ein und anschließend den 6-stelligen Code, den wir Ihnen dorthin senden.